International Journal of Innovative Research in Engineering & Multidisciplinary Physical Sciences
E-ISSN: 2349-7300Impact Factor - 9.907

A Widely Indexed Open Access Peer Reviewed Online Scholarly International Journal

Call for Paper Volume 12 Issue 4 July-August 2024 Submit your research for publication

A Case Study On Total Productive Maintenance In Rolling Mill

Authors: Mr Anthony

Country:

Full-text Research PDF File:   View   |   Download


Abstract: TPM is a technique which helps us in maintaining and improving production system through machine, process, and employee which add a positive value to the organization. TPM has been developed to meet the new maintenance needs by keeping the equipment in top condition so as to avoid breakdown and delay in production. This paper focusing on calculating the overall equipment effectiveness in Rolling Mill, and it also discuss what called the big six losses in any industry (the quality, availability and speed). A case study has been taken in the rolling mill and the main objective of this is to study the manufacturing process and the problem occurs during the production process which causes stoppage. The data taken along fifteen working days. After calculating the OEE of the company a result company achieved 93.48% in quality factor of overall equipment effectiveness equation and 70.90% in availability where in performance it got 90.03% and the result is compared with the World class OEE. Suggestion is given to company so as to improve their maintenance procedures and improve the productivity

Keywords: Types Of Maintenance, Six Big Losses, TPM Pillar, Benefits of TPM


Paper Id: 107

Published On: 2018-03-01

Published In: Volume 6, Issue 2, March-April 2018

Cite This: A Case Study On Total Productive Maintenance In Rolling Mill - Mr Anthony - IJIRMPS Volume 6, Issue 2, March-April 2018.

Share this